Menu
Log in


Log in

Animations

# Lecture Titles & Authors

Duration

 1 Animation [1]: Sutong Bridge Cable Stayed Segment
Mr. H. F. Xiang
3:15 min.
 2 Animation [2]: From IABSE E-Learning_Lecture 12: Adding confidence and reducing risk - the role of independent design checking in major projects: Stockton deck wind tunnel testing
Mr. Ian Firth
36:00 Seconds
 3 Animation [3]: From IABSE E-Learning_Lecture 17: Woodrow Wilson Bridge Bascule Span
Mr. Sean Bluni
22:00 Seconds
 4 Animation [4]: From IABSE E-Learning_Lecture 22: Structures for Stadium Projects :Retractable roof operation
Dipl. -Ing. Knut Goppert
08:00 Seconds
 5 Animation [5]: From IABSE E-Learning_Lecture 22: Structures for Stadium Projects
Dipl. -Ing. Knut Goppert
08:00 Seconds
 6 Animation [6]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Simply Supported Beam Assembly
Mr. Jacques Combault
08:00 Seconds
 7 Animation [7]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Launching Gantry & Segment Placing Step by Step Process
Mr. Jacques Combault
08:00 Seconds
 8 Animation [8]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Progressive Segment Assembly Step by Step Process
Mr. Jacques Combault
08:00 Seconds
 9 Animation [9]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Span-by-Span Construction Technique Step by Step Process
Mr. Jacques Combault
08:00 Seconds
 10 Animation [10]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Pre-Assembled Span-by-Span Erection Step by Step Process
Mr. Jacques Combault
08:00 Seconds
 11 Animation [11]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Short Line Prefabrication Method
Mr. Jacques Combault
08:00 Seconds
 12 Animation [12]: From Presentation entitled: 40 Years of Bridge Engineering: Precast Bridge Construction: Long Line Prefabrication Method
Mr. Jacques Combault
08:00 Seconds
 13 Animation [13]: Le Viaduc de Millau: Animation of Bridge Construction-1
Eiffage CEVM / Foster & Partners / auteur du DVD
16:00 Seconds
 14 Animation [14]: Le Viaduc de Millau: Animation of Bridge Construction-2
Eiffage CEVM / Foster & Partners / auteur du DVD
06:00 Seconds
 15 Animation [15]: Le Viaduc de Millau: Mode shapes for service wind
Eiffage CEVM / Foster & Partners / auteur du DVD
04:00 Seconds
 16 Animation [16]: Le Viaduc de Millau: ArrĂȘt accidental 60m avant Pi2
Eiffage CEVM / Foster & Partners / auteur du DVD
06:00 Seconds
 17 Animation [17]: Phu My Bridge
Provided by Mr. George D. Moir, Bilfinger Berger
02:15 minutes



IABSE
Jungholzstrasse 28
8050 Zurich
SWITZERLAND

Location: Map Info

Have a question?
+41 43 443 97 65
secretariat@iabse.org

Bank details: Click here.
Privacy Policy

Follow Us
on Social Media