Menu
Log in


Log in

Deep Tunnel Sewerage System Phase 2, Singapore

Project Description:

DTSS2 T-09 Contract comprises the detailed design and construction of 7.9 km of used water tunnels with an internal diameter of 6 m, interconnected with multiple online and offline shafts, hydraulic structures, and other air management facilities, located with one of the busiest and densely populated areas of Singapore.


Judges Comments

This 7.9km long tunnel under Singapore incorporates a number of innovative features and was constructed using the largest Tunnel Boring Machine in Singapore at the time. The 7.56m diameter TBM was launched 50m below ground level using a new “flying Launch” method for the first time in Asia. The project makes extensive use of Microbiological Influenced Corrosion resistant concrete, developed and tested specifically to resist the harsh and aggressive environmental conditions inside the tunnel.


Structural Designer

COWI


Location

Singapore





                                                          

IABSE
Jungholzstrasse 28
8050 Zurich
SWITZERLAND

Location: Map Info

Have a question?
+41 43 443 97 65
secretariat@iabse.org

Bank details: Click here.
Privacy Policy

Follow Us
on Social Media